Fujinon Megapixel - 1/3" 3MP Auto Iris 15-50mm, long lead - YV3.3x15SA-SA2L

Fujinon SKU: YV3.3x15SA-SA2L

$121.94 NZD $336.00 NZD Save $214.06 NZD

Shipping calculated at checkout

Currently

Please Note: Estimated delivery details below

Key Features
  • Telephoto Long Focal Length
  • DC Auto Iris
  • ND Filter
  • Aspherical Lens Construction
  • Metal Mount
  • Wide Aperture Ratio of F1.5
  • Cable Length of 0.75' (230mm)

The YV3.3x15SA-SA2 CS-Mount 15 to 50mm 3.3x Optical Zoom Lens for CCTVs from Fujinon is well suited for high-quality image capturing and offers optical performance support up to 3MP. With a focal length of 15 to 50mm, a wide area is covered during surveillance. The high-accuracy aspherical construction, and low-dispersion, high refractive-index glass enhance optical performance. With the built-in ND filter, output is enhanced for high-sensitivity cameras.

alliance wholesale prduct range

Newsletter

Sign up to receive the latest information

Access control pedestal
Video

Video

Promo videos will play in the background