Sort + Filter
Fingerprint Readers
$199.00 NZD | $499.00 NZD
$149.00 NZD | $599.00 NZD
Speed Gate Tailgating Detection: How Effective Is It?
Essential Security Supplies
Speed gate tailgating detection can identify many attempts by a second person to follow through on one credential, but detection does not automatically prevent entry. Effectiveness depends on the lane's optical or infrared sensor coverage, the spacing and behaviour of pedestrians, the configured alarm or gate response, and whether staff act on alerts. Very close followers, side-by-side users, children and luggage demand particular testing. A witnessed site-specific...
Read moreHotel Access Control NZ: What Should Hotels and Motels Specify?
Essential Security Supplies
A hotel or motel access control specification needs five essentials: guest room locks and credentials; front-desk issuing, expiry and cancellation; access to shared entrances, lifts and facilities; authorised staff, master and emergency access; and safe egress. It should also set out door suitability, property management system (PMS) integration, offline operation and acceptance tests. Check each feature against the exact model and software in the proposed installation. What...
Read moreBoom Gate Vehicle Detection: Loops, Radar and Safety Sensors
Essential Security Supplies
A boom gate normally requires an opening request and a separate check that the arm can move safely. A card reader, intercom, ANPR system, exit loop or configured radar may request opening. A safety loop or radar presence zone detects vehicles at the closing line and holds the barrier open according to the approved control sequence. Photocells and safety edges may provide additional protection where a vehicle,...
Read moreAutomatic Bollard Installation NZ: Drainage, Foundations and Power
Essential Security Supplies
Before installing an automatic bollard in New Zealand, confirm three essentials: a foundation designed for the exact bollard model, a reliable drainage route for its underground housing, and protected electrical and control cabling planned before excavation. Obtain the manufacturer’s civil and electrical drawings, check how pit water will discharge or be pumped, and agree what happens during a power failure. A site-specific engineering design and commissioning plan...
Read more